Connect effortlessly with Zoom, Teams, and Google Meet—integrated by AV Structural.

Case Studies

Explore real-world solutions and innovative structural projects across sectors, showcasing our expertise in design, problem-solving, and client collaboration from concept to completion.

McLaren Walnut Creek

Since 2018, the Luxury Cars Collection of Walnut Creek, CA has hired AV Structural to install thin-bezel 3 foot by 3 foot LCD video walls in their showrooms throughout the Greater Bay Area.

Human Longevity Inc.

The Human Longevity center in South San Francisco is a global leader in advancing the Human Longevity Care movement. Recently contracted with AV Structural to provide turnkey design..

Palace Hotel by Marriott

The Palace Hotel, a San Francisco landmark since 1875, is more than a luxury destination—it’s a piece of architectural history. When Marriott needed audio upgrades across nine distinct event spaces..

CalFire Training Institute

The California Department of Forestry and Fire Protection operates four training centers located throughout California. They are used for year-round training in fire protection and prevention.

Contra Costa & Solano

As part of its mission to fight hunger across 16 Northern California counties, the Foodbank of Contra Costa & Solano Counties needed to upgrade the AV systems in two of its warehouse facilities.

Stanford University

The Stanford Central Energy Facility is a flagship project in sustainable infrastructure—replacing a fossil-fuel-based power plant with a revolutionary heat recovery and grid-powered system..

Contra Costa Water District

AV Structural has partnered with Contra Costa Water District (CCWD) to provide AV systems across their facilities. From executive boardrooms and emergency control..

Our Clients

What Our Clients Say

Your Structural Partner from Concept to Completion